Hirakubo Peninsula Community Council

THE ORDINANCE

Why an ordinance, and not a promise.

What the Hirakubo Peninsula needs is one effective rule that applies equally to everyone who does business here. A voluntary agreement cannot deliver that: it binds only those who sign it, and it carries no force. That is why we are asking Ishigaki City to enact an ordinance.

Neither Japan's Building Standards Act nor its Landscape Act sets a numerical standard for the darkness of the night. Unless a region defines one, every case is judged differently. The draft is in its fourth version: nine chapters, thirty-four articles. It has not been enacted, and this page describes a proposal, not law.

Lighting standards modelled on Aoraki Mackenzie

The lighting chapter of our draft ordinance is drawn from the LIGHT chapter of the Mackenzie District Plan in New Zealand, home of the Aoraki Mackenzie International Dark Sky Reserve. We took that plan as our reference for a specific reason: Mackenzie District wrote its lighting rules into the district plan in 1981, thirty-one years before the reserve was designated in June 2012. The rules came first; the darkness survived; the international value followed.

Item Hirakubo draft Mackenzie District Plan
Correlated colour temperature2,700 K or less for new installations; 3,000 K for existing3,000 K (LIGHT-S3)
Upward light0% upward light output ratio (2.5% permitted for existing fittings until replacement)Shield edge below the whole light source; all light below horizontal (LIGHT-S2)
Lamp typesLED, low pressure sodium and high pressure sodium onlySame (LIGHT-S4)
Illuminance at the site boundary1 lux from 22:00 to 06:00; 5 lux from 06:00 to 22:00Same values for rural zones (LIGHT-S5)
CurfewFloodlights, lighting of unused areas and recreational facility lighting off from 22:00 to 06:00Same categories prohibited 22:00–06:00 (LIGHT-R1)
SkylightsNo light spill from upward-facing skylights, 22:00–06:00No spill after 22:00 (LIGHT-R3)
Signage luminance100 cd/m² or less; off 22:00–06:00—

To be precise about the comparison: the boundary illuminance figures match the values for rural zones in the Mackenzie District Plan, not the plan as a whole. Our draft also carries a total luminous flux cap of 5,000 lumens per 100 m² of site area, for which the Mackenzie plan has no equivalent provision; we intend to recalibrate it against our own SQM measurements. Existing installations have a ten-year transition period, and lighthouses, navigation aids, road and community security lighting, fishing-port and agricultural work lighting, and emergency lighting are exempt.

What the rest of the draft covers

Ch. 2 Landscape (Arts. 5–6)The peninsula already lies inside Ishigaki City's landscape plan. The ordinance adds a further layer of standards rather than duplicating it.
Ch. 3 The dark sky (Arts. 7–11)The lighting standards above, a ten-year transition for existing fittings, designated dark-sky areas, and a maintenance target of SQM 21.0 measured with a Sky Quality Meter.
Ch. 4 Prior notification (Arts. 12–15)Notify the city thirty days before starting work that already requires notification under the landscape plan, plus buildings and land development over 1,000 m², new or extended accommodation, and large lighting installations. Handled before building confirmation, so that problems do not surface after work has begun.
Chs. 5–6 Nature and the coast (Arts. 16–25)Designated natural-use areas, certified guides, caps on visitor numbers, registration of buggy operators; on the coast, rules on vehicle access, roadside parking and marine activities, with multilingual notice to visitors. Not to prevent use, but to decide how it is used.
Ch. 7 Working with operators (Arts. 26–28)Operators inform their visitors of the rules. The council's certification scheme takes compliance with the ordinance as a requirement, and the city's support takes certification into account.
Ch. 8 Measures (Arts. 29–32)Guidance, recommendation, publication, and a link to the city's permits and subsidies. The design is that operators who meet the standard are better off, not that others are punished.
Ch. 9 Transparency (Arts. 33–34)The number of notifications, the number of change orders and the trend in SQM readings are published every year. The council holds an annual review meeting. A standard is not finished when it is written.

This is not without precedent

Ordinances of the same kind are already in force elsewhere. We drafted ours from provisions that are actually working in those places.

Aoraki Mackenzie, New Zealand
Outdoor lighting in the district plan since 1981. The direct source for Chapter 3.
Ibara City (formerly Bisei), Okayama
Japan's first light-pollution ordinance, 1989.
Tottori Prefecture
Star-sky conservation ordinance, 2017. Upward light output ratio capped at 2.5%.
Niseko, Hokkaido
Landscape ordinance linking height and area limits to building confirmation.
Karuizawa, Nagano
Land-use procedures ordinance: a gate before, not a penalty after.
Ogasawara and Kerama, Okinawa
Managed use under approved ecotourism master plans.

Where this stands

The draft has been revised three times since the first version, each time in response to criticism: the second for residents' daily life, the third because it lacked any working procedure, the fourth for how it read. Two further amendments were made within the fourth version — in September 2026, to align with the city's existing landscape plan, and to bring the lighting standards up to international practice. It has not been submitted to the city assembly.

Read the full text (JA) Revision history (JA)

This page is a summary written for readers outside Japan. The authoritative text is the Japanese draft. Comments on the draft are welcome, for or against — get in touch.